Skip to product information
1 of 4

Armed Forces Combat Ration

Armed Forces Combat Ration

Regular price €39.99
Regular price €45.99 Sale price €39.99
Sale Sold out
Tax included. Shipping calculated at checkout.
Module

The Forze Armate Razione Viveri Da Combattimento is the official combat ration of the Italian army, designed to provide energy, nutrients, and practicality in any extreme situation. This military ration is used by the Italian Armed Forces during maneuvers, training, or real missions, and stands out for its quality, variety of food, and careful presentation.

What does this Italian military ration include?

Each package contains prepared food to meet a soldier's needs for 24 full hours. Among its most common components are:

  • Canned main courses (pasta, rice, or Italian stews).
  • Snacks and energy supplements: bars, crackers, nuts, or chocolate.
  • Instant drinks: coffee, tea, mineral salts, or isotonic drinks.
  • Utensils and accessories: portable stove, matches, cutlery, napkins, can opener, and water purification tablets.
  • Weight: approx. 2500 grams

Why is it so highly valued among collectors and survivalists?

  • Authentic origin: It is a genuine military ration, manufactured in Italy for its army.
  • High collectible value: Due to its unique design and difficult availability outside the country.
  • Ideal for bushcraft and survival: Compact, complete, and with great durability.
  • Superior gastronomic quality: Italian culinary tradition is reflected even in its field rations.

     

    Recommended uses

    • Emergency preparedness.
    • Outdoor activities such as hiking, camping, or bushcraft.
    • Tactical training or drills.
    • Collecting international military rations.

Typical content (may vary slightly depending on the batch):

  • 2 canned main courses (pasta/rice)
  • 2 energy bars
  • Military crackers
  • Coffee, tea, isotonic drink sachets
  • Sugar, salt, chewing gum, and tissues
  • Portable stove + fuel tablets
  • Can opener, cutlery, napkins
  • Water purification tablets
  • User manual (in Italian)
  • BEST BEFORE DECEMBER 2026
View full details